IPR OVERHAULS PUMP FOR CUSTOMER IN MANUFACTURING SECTOR

BLURB FOR ONLINE PLATFORMS
IPR lately provided a pump dewatering resolution to a repeat buyer, and then undertook the entire rebuild of a damaged pump set. Henru Strydom, operations supervisor at IPR, says that coping with a pump rental company that has the expertise and functionality to undertake a whole pump overhaul was a major advantage for this manufacturing sector customer.
MEDIA RELEASE – 16-08-2022
IPR OVERHAULS PUMP FOR CUSTOMER IN MANUFACTURING SECTOR
Dealing with a pump rental firm that has the experience and functionality to undertake a complete pump overhaul proved to be a serious advantage for a buyer in the manufacturing sector recently.
Having had previous pump rental expertise with IPR, this customer requested pressing help when the pump it was using for water switch at its operation turned problematic.
“Not only have been we able to present a fast pump dewatering rental solution to this customer,” says Henru Strydom operations manager at IPR, “we were additionally capable of undertake the entire overhaul of the pump making certain it was back in operation inside a comparatively brief time frame.”
Years of operation transferring water from one dam to a different had taken it toll on the pump that was in use at the customer facility, and such is its manufacturing operation that it could not be with no dewatering pump. IPR’s staff have been contacted for a rental pump set and have been able to deliver extra than simply that to its buyer.
Strydom says that the damaged pump was removed from website and replaced with a rental unit. On Be the first on the company’s comprehensively outfitted facility, the IPR staff discovered that the harm was both mechanical and electrical, and that a full rebuild of the pump set could be essential to make sure reliable operation going ahead.
The pump set was completely stripped, and particular person components assessed prior to the final choice on what work would must be done. The final overhaul noticed all bearings changed as a end result of extreme wear and a brand new engine wiring harness substitute the old one which was broken after short-circuiting. Other broken parts replaced together with the control panel.
Following this work, the pump set components have been spray painted in IPR’s in-house spray booth, and then the pump was subjected to last quality management inspections prior to it being examined in the company’s test tank. “Doing this gives our customer full assurance that the rebuilt pump set is capable of conferences its rated circulate of ninety litres per second at a most head of 25 metres,” Strydom says.
This is not the primary full pump rebuild that IPR has done, and Strydom explains that having an in-depth understanding of pump applications and operations is an advantage particularly when overhauling pump units. “The stage of trust that lots of our clients have in IPR has seen this sector of our enterprise broaden exponentially and we anticipate that it will consider doing so.”
CAPTIONS
OVERHAUL PIC 01 : IPR lately undertook the entire rebuild of a broken pump set for a repeat buyer.
OVRHAUL PIC 02 : IPR maintains having an in-depth understanding of pump functions and operations is a bonus especially when overhauling pump units.
OVERHAUL PIC 03 : A complete rebuild of the pump set ensured reliable operation going ahead for this IPR customer.
OVERHAUL PIC 04 : The utterly overhauled pump set which IPR undertook for a repeat customer within the manufacturing sector.
Hashtags
#roundtheclockdewatering
#hasslefreedewatering
#dewateringpumps
#dewatering
Contact data
On behalf of IPR
www.pumprental.co.za
LinkedIn : https://www.linkedin.com/company/integrated-pump-renta-/?viewAsMember=true
Facebook : https://www.facebook.com/IntegratedPumpRental/
Instagram : https://www.instagram.com/ipumprental/
From Coralynne & Associates
communicate@coralynne.co.za
Twitter : Coralynne_Assoc
LinkedIn : Coral-Lynn Fraser-Campbell
Share

Leave a Comment